Brand Name : SIMPLY
Model Number : SII-DR273
Certification : SGS
Place of Origin : China
MOQ : 1 sets
Price : Negotiable
Payment Terms : T/T, Western Union, MoneyGram, L/C
Supply Ability : 6000 ton per year
Delivery Time : 30 working days
Packaging Details : Export standard carton, wooden or steel pallet is available.
Material : Steel Q235B
Color : Blue, Yellow, Orange, Red, Grey, etc.
Surface Treatment : Powder Coating
Mobility : Fixed
Usage : Supermarket, Shipping Mall, Household, Car Spare Parts Warehouse, etc.
Size : Custom
Loading : 500-2000 kg
Components : Main Beam, Upright, Stairs, etc.
Advantages : Space Saving
Shipment : Ocean Sea Shipment
Project Heavy Duty Steel Storage Racks Mezzanine Floor for Carton
Mezzanine Floor racking system is to build a loft on an existing work site or shelf to increase storage space. It can be used as a second and third floor loft. It is advisable to access some light foam and small and medium-sized goods, suitable for large-volume or multi-variety small batches of goods, and manually accessing goods.
Features/Advantages
1. Mezzanine can take full advantages of valuable warehouse space, cause it expands upwards rather than outwards
2. Mezzanine rack usually has a big load capacity with the advantage of low cost and easy installment
3. Mezzanine racking is suitable for the fields of big height warehouse, little goods, unloading it manually and big storage quantity
Preliminary Preparation of Client
Please provide information regarding your warehouse
1. Warehouse's layout or supply warehouse dimention: width x height x length
2. Mezzanine's loading capacity
Specifications of Mezzanine Floor System
1) Item | Project Heavy Duty Steel Storage Racks Mezzanine Floor for Carton |
2) Item No.: | SII-DR273 |
3) Type: | Mazzanine Floor System |
4) Loading Weight: | Designed according to specific requirements |
5) Material: | Steel Q235B |
6) Surface Finish: | Powder Coating |
7) Size: | Custom |
8) Component: | Beam, Upright, Roller, Slideway, Layer Plate |
9) Supply Ability: | 300-400 ton per month |
10) Sample Time: | About 7-10 working days |
Mezzanine Project
Basic Components
Project Heavy Duty Storage Racks Steel Mezzanine Floor For Carton Images |